Abstract
2400 km of special radiation resistant optical fibres were procured by CERN (European Organization for Nuclear Research), for the installation of more than 55 km of optical fibre cables in the accelerator complex underground during the Long Shutdown 1 (LS1). In the frame of this large-scale industrial production, a thorough quality assurance plan (QAP) was put in place and followed at each step of the process. In-depth qualification of optical fibres preceded the 17-month procurement process. All supplied batches were tested for their resistance to radiation, leading to more than 65 quality control irradiation tests. During the cable assembly process and the installations works, a full traceability down to the optical fibre level was ensured. The actions put in place in the frame of the QAP led to successful installation works and to full respect of the LS1 planning.
© 2015 IEEE
PDF Article
More Like This
Near-infrared radiation induced attenuation in nested anti-resonant nodeless fibers
Sacha E. R. Medaer, Thomas D. Bradley, Diego Di Francesca, Qiang Fu, Gregory Jasion, Jochen Kuhnhenn, Stefano Meroli, Francesco Poletti, Bernhard Schmauss, Austin Taranta, Konstantin Vidiajev, Udo Weinand, Natalie V. Wheeler, Raphael Wolf, and Daniel Ricci
Opt. Lett. 48(23) 6224-6227 (2023)
Cited By
You do not have subscription access to this journal. Cited by links are available to subscribers only. You may subscribe either as an Optica member, or as an authorized user of your institution.
Contact your librarian or system administrator
or
Login to access Optica Member Subscription