Abstract

Large-scale CPV power plants deliver the high energy production and low electricity cost that will allow PV to become a substantial portion of the electrical grid supply. High concentration minimizes the semiconductor material costs, while dual-axis tracking delivers higher capacity factors and provides a better match to demand. In order to prove the net cost benefits, however, annual deployments must exceed the tens of MW range. CPV companies, including Amonix, are reaching this level in 2011. Annual performance improvements combined with aggressive cost reductions are the means for Amonix to win the projects needed to gain more economies of scale. Energy modeling has been used to increase both the rated power and energy yield. Solar power generators deployed in 2011 exceed previous performance by more than 10%. Rated output now exceeds 60 kWAC-PTC and AC system efficiency exceeds 27%. A similar increase in performance is expected by 2012.

© 2011 Optical Society of America

PDF Article
More Like This
A Solar Compass for Enhancing the Efficiency of Concentrating Solar Power Plants

Daniele Murra, Sarah Bollanti, Fabrizio Andreoli, Lili Cafarella, Domenico De Meis, Paolo Di Lazzaro, Domenico Di Mauro, Francesco Flora, Gian Piero Gallerano, Luca Mezi, Luca Murra, Davide Vicca, and Achille Zirizzotti
PvTh1G.4 Optical Devices and Materials for Solar Energy and Solid-state Lighting (PVLED) 2020

Materials for Fresnel Lenses in Concentrating Photovoltaics

Ralf Leutz
SRWC4 Optics for Solar Energy (OSE) 2011

Suncore’s CPV Technology for Large-Scale Grid-connected Solar Power Plants

James Foresi, Charlie Wang, Alaric Babej, Rick Han, and Tingdi Liao
RTh3B.1 Optics for Solar Energy (OSE) 2014